Prefab Labor Camp K House designs decide how efficiently you use site area, move people and deliver services. At FOSHAN SOEASY MODULAR HOUSING CO LTD, we understand that every camp project starts with the question of layout, because the right configuration balances capacity, privacy, service access and installation speed. This guide explains how procurement managers, contractors and site planners can evaluate layout options to create functional, cost-effective and worker-friendly K-type prefab houses.

 

How many people do you need to house?

The very first step in planning a Prefab Labor Camp K House is defining the required capacity. Without accurate capacity planning, you risk either underusing land or creating overcrowded conditions that lead to poor living standards and higher operational costs.

Define workforce mix and rooming ratios

A camp is rarely uniform. Skilled workers, semi-skilled staff and supervisors often need different accommodation standards. For example, supervisors may expect single rooms or two-person modules, while semi-skilled workers are usually housed in four to six-bed dormitories. Early in the planning stage, map out these ratios according to your workforce composition.

Dormitory types: bunk vs single bed vs small shared rooms

Bunk-style dormitories allow the highest density, accommodating up to eight persons in a standard module. Single bed layouts provide greater comfort and privacy but reduce overall capacity. Small shared rooms of two or four strike a balance, giving more personal space without sacrificing efficiency. The right choice depends on budget, cultural expectations of workers and the duration of stay.

Example capacity calculations

Consider a 3.64m × 7.28m K-type prefab house module. Configured with four bunk beds, it houses eight workers. Using the same module with single beds reduces capacity to four. For a 200-worker camp, you might need 25 modules at eight per room, but 50 modules at four per room. These decisions directly affect land footprint, service requirements and material costs.

 

Standard K House module sizes and layout implications

The K-type prefab house follows a modular design system, which means every layout must work within standardized spans and panel sizes.

K-modulus explained

The K House uses a structural grid where the basic span is 1.82m. This span determines room depth and how interior walls can be arranged. For example, a 5K building measures 9.1m in length, while a 6K building measures 10.92m. Understanding this modular logic helps project leads design rooms that fit beds, lockers and circulation without wasting space.

Stacking and multi-storey considerations

When land is limited, stacking modules up to three floors is common. Multi-storey dormitories require staircases, landings and corridor systems that comply with safety codes. A two-floor configuration is often the sweet spot: it doubles capacity without complicating emergency egress too much. Three floors may be chosen for very tight sites, but require careful planning of stair positions and escape routes.

Circulation and emergency egress

Corridors, staircases and exits must be considered at the layout stage, not as an afterthought. For example, modules aligned in rows need central corridors of at least 1.2m width to ensure safe evacuation. Staircases should be placed at both ends of a block for fire safety. These design choices protect worker welfare and meet international standards.

 Prefab Labor Camp K House

Zoning the camp: accommodation, canteen, toilets, clinic, offices, recreation

A well-designed Prefab Labor Camp K House layout is not only about dormitories but about how all camp functions fit together. Zoning reduces walking distances, organizes utilities and improves quality of life.

Adjacency matrix: key service placement

Canteens should be centrally located to minimize travel time for all dormitories. Toilets and showers must be placed adjacent to or integrated within accommodation blocks, avoiding long nighttime walks. Offices and management zones should be separated from living quarters to maintain authority and privacy.

Waste, laundry and utility zones

Locating laundry rooms, waste disposal areas and utility blocks at the periphery of the camp prevents service traffic from disturbing residential areas. It also makes it easier for trucks to collect waste without entering pedestrian zones. Proper planning of these zones reduces daily operational costs.

Avoiding noise and smells

Placing kitchens, canteens and waste areas downwind of dormitories improves comfort. Recreational areas like TV rooms or gyms should be separated from sleeping areas to reduce noise at night. These small placement strategies create a more livable environment without major cost increases.

 

Installation speed, modular delivery and phased build plans

One of the biggest advantages of the K-type prefab house is rapid installation. But the layout directly affects how quickly you can bring a camp into service.

Prefab delivery sequencing

Modules are typically shipped in flat-packed bundles. Planning the sequence of delivery ensures that the first essential blocks—like dormitories and toilets—arrive first and are installed immediately. This reduces downtime and allows early occupancy.

On-site crew and installation rate

A standard installation crew can erect about 300㎡ of K House structures per day. That equals roughly three to four dormitory modules. By multiplying crew size and daily rate, project managers can forecast installation timelines accurately. For example, a 1,500㎡ camp might be operational within one week with sufficient labor.

Phased occupancy

A practical strategy is to open parts of the camp as soon as the first dormitory blocks are ready, while construction continues on remaining facilities. This staged approach is especially useful in fast-moving projects where workers need accommodation before the entire site is completed.

 

Cost vs comfort tradeoffs in layouts

Budget pressure often forces procurement managers to choose between maximizing bed density and ensuring worker welfare. The layout plays a central role in striking the right balance.

Maximizing density vs ensuring welfare

Packing more beds into each module saves money on materials and land but can reduce morale, health and productivity. Allowing more space per worker, adding windows for natural light and designing proper ventilation increase upfront cost but lead to better retention and fewer complaints.

Upgrading insulation and partitions

In hot or cold climates, upgrading wall panels and roof insulation pays back quickly in energy savings. Adding partitions to create semi-private zones improves worker satisfaction at relatively low additional cost. These comfort upgrades should be considered early in the layout phase, when adjustments are easiest.

 

Conclusion

Choosing the right layout for a Prefab Labor Camp K House determines whether your project will be efficient, safe and comfortable for workers. From capacity planning and modular dimensions to zoning, installation speed and cost-comfort tradeoffs, every decision affects long-term camp performance. At FOSHAN SOEASY MODULAR HOUSING CO LTD, we provide tailored design services to match your site area, workforce needs and project timeline. Contact us today to request a layout plan, a downloadable capacity matrix or a site visit quote.

LEAVE A MESSAGE
Leave a Message
LEAVE A MESSAGE
FOSHAN SOEASY MODULAR HOUSING CO., LTD.
No.1 Professional Camp Provider
One-Stop Prefab Camp Projects Solution

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

WhatsApp: +86-156-2541-8620
Landline: +86-757-8335-3895
Phone: +86-156-2541-8620
E-mail: export@soeasyhouse.com
Address: No.7 Wende 4 th street, Dawang High-Tech Zone, Zhaoqing, Guangdong, China
Copryright © 2024 Foshan Soeasy Modular Housing Co., Ltd. All Rights Reserved. Sitemap. Privacy Policy.